Skip First Level Navigation | Skip All Navigation
| Home | Contact Us | Site Map |
|
Home
>Process and Proposed Schedule
Process and Proposed ScheduleMaineDOT has contracted with the engineering, architecture and planning firm of DMJM Harris to conduct the Project master plan and EA (Environmental Assessment). The primary goal of our work will be to prepare an EA to document the project’s environmental decision-making process in order to satisfy the requirements of NEPA, NPS Director’s Order 12 and Handbook, the Army Corps of Engineers Highway Methodology and Maine’s Sensible Transportation Policy Act (STPA). The EA will evaluate the direct, indirect, secondary, and cumulative environmental consequences of the proposed action, both natural and man-made for the Preferred Alternative compared to the No Build Alternative. In general, this process will include the following steps:
The schedule for this process is as follows:
Download a PDF version of this graphic (PDF Document)
This page last updated on 3/31/09 |
| Copyright MaineDOT © 2008 All rights reserved. |